Role of the Designated Contracting Party, i.e. Substantive Examination and Opposition Procedure Before a Designated Contracting Party, Notifications by Designated Office on the Status of International Registration - Mr. Sunao Sato
رمز الوثيقة | WIPO/TM/PNH/16/T9 |
الاجتماعات ذات الصلة | WIPO/TM/PNH/16 |
تاريخ النشر | 21 يناير 2016 |
English | Role of the Designated Contracting Party, i.e. Substantive Examination and Opposition Procedure Before a Designated Contracting Party, Notifications by Designated Office on the Status of International Registration - Mr. Sunao Sato |