IPC 6 English version
 
Class E02

SECTION E– FIXED CONSTRUCTIONS

E 02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING

E 02 BHYDRAULIC ENGINEERING (ship-lifting E 02 C; dredging E 02 F)

E 02 CSHIP-LIFTING DEVICES OR MECHANISMS

E 02 DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E 02 B); UNDERGROUND OR UNDERWATER STRUCTURES [6]

E 02 FDREDGING; SOIL-SHIFTING (winning peat E 21 C 49/00)