(0)E21D:0/2:
IPC6
SECTION E - FIXED CONSTRUCTIONS
SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
E21D
1/3
<<   >>   E21D001/00 - E21D009/14  

E 21 D

SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS (soil conditioning or soil stabilising materials C 09 K 17/00; drilling or cutting machines for mining or quarrying E 21 C; safety devices, transport, rescue, ventilation or drainage E 21 F) [2,6]
 

Notes

(1)

This subclass covers methods or apparatus for making or lining tunnels, galleries or large underground chambers, using underground mining methods only, i.e. not involving disturbance of the ground surface. [6]

(2)

This subclass does not cover underground spaces made by foundation engineering, i.e. involving disturbance of the ground surface, which are covered by subclass E 02 D. [6]

 

 

 

Shafts

 

1
/ 00 Sinking shafts

1
/ 02 by hand  

1
/ 03 mechanically (E 21 D 1/08 takes precedence)  

1
/ 04 with grabs  

1
/ 06 with shaft-boring cutters (drilling machines E 21 B, E 21 C)  

1
/ 08 while moving the lining downwards  

1
/ 10 Preparation of the ground  

1
/ 12 by freezing  

1
/ 14 Freezing apparatus  

1
/ 16 by petrification (grouting anchoring-bolts E 21 D 20/02)  
 

3
/ 00 Raising shafts, i.e. working upwards from the bottom
 

5
/ 00 Lining shafts; Linings therefor ( E 21 D 11/00 takes precedence) [3]

5
/ 01 using prefabricated lining lowered into a hole filled with liquid or viscous mass  

5
/ 012 Use of fluid-tight or anti-friction material on outside of, or between, lining layers  

5
/ 016 Bearer curbs  

5
/ 02 with wood (E 21 D 5/01, E 21 D 5/012, E 21 D 5/016 take precedence)  

5
/ 04 with brick, concrete, stone, or similar building materials (E 21 D 5/01, E 21 D 5/012, E 21 D 5/016 take precedence)  

5
/ 06 with iron or steel (E 21 D 5/01, E 21 D 5/012, E 21 D 5/016 take precedence)  

5
/ 08 in the form of profiled parts  

5
/ 10 in the form of tubbing  

5
/ 11 with combinations of different materials, e.g. wood, metal, concrete (E 21 D 5/01, E 21 D 5/012, E 21 D 5/016 take precedence)  

5
/ 12 Accessories for making shaft linings, e.g. suspended cradles, shutterings  
 

7
/ 00 Shaft equipment, e.g. timbering within the shaft

7
/ 02 Arrangement of guides for cages in shafts; Connection of guides for cages to shaft walls (guideways or guides for elevators B 66 B 7/02)  

Tunnels; Galleries; Large underground chambers; Linings therefor (galleries protecting against falling rocks or avalanches E 01 F 7/04; pressure galleries, galleries specially adapted to house pressure water conduits E 02 B 9/06; sewers E 03 F) [3,6]

 

9
/ 00 Tunnels or galleries, with or without linings; Methods or apparatus for making thereof (linings per se E 21 D 11/00); Layout of tunnels or galleries [3]

9
/ 02 Driving inclined tunnels or galleries [3]  

9
/ 04 Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for  

9
/ 06 Making by using a driving shield [2]  

9
/ 08 with additional boring or cutting means [2]  

9
/ 10 Making by using boring or cutting machines (E 21 D 9/08 takes precedence; mining picks E 21 C 35/18) [3]  

9
/ 12 Devices for removing or hauling away excavated material or spoil; Working or loading platforms (underground transport E 21 F 13/00) [2]  

9
/ 14 Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings [3]  

<< >>
1 1 3